
More Pictures from April 11, 2003
|
April 11 |
Photos by John Hill |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Dave Beaty wiring actuator connections in the SX mirror cell. | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| Generating the back side of the second 8.4m primary mirror. | |
![]() |
![]() |
| The first 8.4m primary mirror under the test tower. | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| The integrated P45 prototype adaptive secondary using the cabling style developed for LBT672. | The BCU (Basic Control Unit) DSP board developed by Microgate for computing wavefront slopes. |