Your browser does not support script August 2003 Telescope Construction
 
 

August 2003

August 21    August 19-20    August 15    August 4


August 21

Photos by Ray Bertram and Friends

Preparing the inner frame of the Mirror Transport Box. The lid of the Mirror Transport Box.
Lowering the dummy mirror into place.

August 19-20

Photos by Jim Slagle & John Hill

Telescope structure being assembled in the LBT enclosure on Mt. Graham. This is near the present balanced orientation of the telescope.
The telescope is moving toward the horizon-pointing orientation. This motion is done with the assistance of the overhead crane.
The telescope structure pointing at the horizon. The horizon-pointing telescope seen from above.
The frame of the mirror transportation box assembled at T.A. Caid in Tucson. 672 holes have been drilled in the reference body for the F/15 adaptive secondary.
The Dummy Mirror is loaded on the truck ready to leave the Mirror Lab.

August 15

Photos by John Hill

Telescope elevation structure in the zenith-pointing position. The view from above.

August 4

Photos by John Hill

Mounting flanges for the M1 Cell on the elevation structure. Left-side view of the telescope elevation structure.
The space for the SX M1 Cell on the telescope. Bogie drive wheel D-left.
 
 
 
 