August 2004

August 30     August 28     August 26-27     August 23     August 19


August 30

Photos by Daniele Gallieni

The coldplate arrives from ADS and prepares for interface testing with its reference plate.

Top


August 28

Photos by John Hill

The second Primary Mirror Cell arrives at the Base Camp from Ohio State University. The Bell Jar, also shipped from the Ohio State University.

  The Bell Jar with Telescope Director John Hill's vehicle for size comparison.
More from August 28
Top

August 26-27

Photos by John Hill

The Enclosure doors separate. The first 8.4m Primary Mirror, with most of the blue peelable coating taken off.

The telescope illuminated by moonlight. The Large Binocular Camera (LBC) casts a shadow over the moonlit Primary Mirror.

The moon reflecting off the LBC lenses.
More from August 26-27
Top

August 23

Photos by John Hill

  Working on the stressed lap in the Mirror Lab.
Top

August 19

Photos by John Hill

Hydrostatic Bearing System. Enclosure Rotation Controls on the bogie drives.

  Enclosure Rotation Controls on the bogie drives. Working on the Hydrostatic Bearing System at the base of the Telescope.
More from August 19
Top
 
 
 
 