Back to
Enclosure Construction
August
2000
August 23
August 10
August 23
Photos by
Jim Slagle
Enclosure Cable Chain on top of the Telescope Pier.
Rear side of the Rotating Enclosure.
4 x 10 meter hatch at the front of the observing floor.
Working on the Utility Trench entrance.
It is very crowded with snowmelting equipment on Level 10.
Top
August 10
Photos by
John Waack
LBT Enclosure on a foggy August afternoon.
Stealth Exhaust Ducts on the Rotating Enclosure.
Side Ventilation Door partially open.
Installing pipes inside the Pier.
Electrical switchboard on the first floor.
Louvers on an individual Stealth Exhaust Fan.
Work in the observing chamber on the 5th level.
Intake side of a Stealth Exhaust Fan for removing warm air from the telescope structure.
Installing the Enclosure Cable Chain on top of the Pier.
Shutter Latches waiting to be installed.
Cable Chain on the Enclosure Crane (can you guess the part number?).
More from August 10
Top
© 2004 Large Binocular Telescope Corporation