August 1999

August 9


August 9

Photos by Jim Slagle

High school students from Bylas working at the observatory site for their summer job. Work on the concrete forms and Azimuth Ring template for the Pier Upper Ring structure.
   
Crews from Emerald Peak Enterprises working on the forms for the Pier Upper Ring concrete. Otis Elevator technicians installing the elevator in the elevator shaft of the Fixed Enclosure.
   
Workers from R. E. Lee Mechanical fabricating ductwork in the Fixed Enclosure. Electrician from Gilbert Electric installing wiring.
   
Iron workers from Schuff Steel installing braces in the main shutters. Stealth exhaust duct from level 4.
   
  Work on the rotation portion of the LBT enclosure on Mt. Graham.