Back to
Enclosure Construction
July
1999
July 26
July 21
July 5
July 26
Photos by
Jim Slagle
Rear wall and elevator shaft of the Rotating Enclosure.
Horizontal truss for the left shutter.
Installed vertical section of the left shutter.
Stealth exhaust duct from level 4.
Work on the concrete forms for the Pier Upper Ring structure.
Top
July 21
Photos by
Jim Slagle
Work on the concrete forms for the Pier Upper Ring structure.
Rotating Enclosure structure as viewed from the ground.
Top
July 5
Photos by R. Teachout
Aerial view of the rotating enclosure.
Top
© 2004 Large Binocular Telescope Corporation
Website Credits