June 2001

June 7 (Williams Mosaic)     June 7 (Slagle Photos)     June 5


June 7

Photo by Tim Williams

  Panorama of the open observing chamber.
 Top

June 7

Photos by Jim Slagle

Finishing the walls in the Fixed Building. More finishing on Level 4.
   
Cables installed for lifting the 4x10 hatch in the observing floor. Trimming the shutter door beams on level 5.
   
View toward VATT and SMT. Opening the left shutter door.
   
Looking out the ventilation door at the back of the shutter door. A partially open shutter door from inside the observing chamber (note man at bottom for scale).
   
Partially open left shutter door from below. This was the first time the shutter doors were opened under electronic control!
   
Now the door is closing again. View of LBT enclosure from in front of the VATT.
   
Now opening the right shutter door. About 75% open....
   
An interesting angle? Working on the utility trench.
More from June 7
 Top

June 5

Photos by Jim Slagle

Working on the fire alarm and sprinkler system. The main entrance and lobby.
   
The living room and dining room. Construction Manager Wood Hart inspecting the hallway.
   
Many pipes near the mirror ventilation system. Looking up through the hatch from Level 4.
   
View out the ventilation door toward the south. View across beneath the center portal from Level 9.
   
View toward Peak 10516 to the North.
More from June 5
 Top
 
 
 
 