May 31
May 30
May 4
May 31
Photos by
Peter Wehinger
View looking east up the LBT access road.
Visitors admire the LBT enclosure.
Workers on the inside wall of the rotating enclosure.
Steelwork and siding trim are now being completed.
Looking into the opening where the Azimuth Ring of the telescope will sit on top of the 14-meter diameter concrete pier.
A construction worker next to one of the four bogies that the enclosure rotates on.
Jim Slagle explaining the bogies to visitors.
Runway (gray) for the overhead bridge crane (yellow) on the side wall of the rotating enclosure.
LBT enclosure seen through the trees.
Overhead bridge crane (yellow) in the fixed part of the enclosure. The crane has two trolleys on the bridge which combine to lift 55 metric tons.
Top
May 30
Photos by
Jim Slagle
Chain drive unit for opening the shutter doors.
Top
May 4
Photos by
Jim Slagle
Installation of the fire protection system.
New wiring for the bogie drives.