Enclosure Construction
May
199
8
May 31
May 19
May 6
May 31
Photos by S. Criswell
Aerial View of LBT Enclosure.
Top
May 19
Photos by
Jim Slagle
Siding is installed on the fixed enclosure.
The embedded beam and rail are put in place.
Preparations for installing roofing on the auxiliary building.
Top
May 6
Photos by
Jim Slagle
Form work for the Embedded Beam atop the enclosure ring wall.
Start of siding on the fixed enclosure.
Top