February 2004

February 26-28    February 20    February 19    February 17    February 10

February 26-28

Photos by John Hill

Vacuum Lifting Fixture resting on top of the Mirror Cell. Telescope Electrical Distribution Panels on the side of the C-Ring.  Installed by Gilbert Electric.
LBT Enclosure after a winter storm. Tom Herbst inspects the rails for mounting his interferometer to the elevation structure.

February 20

Photos by Enzo Anaclerio, Luciano Miglietta, & Jeff Rill

The Prime Focus Spiders preparing for shipment from Italy to the United States.
Final Testing of the EPDM seal for the large M1 vacuum seal. The INS fiber crew finished terminating 80 fibers in the Main Control Room on Mt. Graham.

February 19

Photos by AIP

The so called "Crab" which supports the on-axis part of the AGW unit. The "Crab" in more detail.

Top


February 17

Photos by John Hill

The Elevation Electronics Rooms are the white structures ("Tree houses"). The 8.4m Primary Mirror (in white box) will be integrated with the Mirror Cell (left) and reattached to the Telescope Structure.

February 10

Photos by John Hill

The crane (yellow) prepares to lift the Mirror Cell off of the Telescope Structure. The Mirror Cell detached from the Telescope.
Lowering through the hatch into the Auxiliary Building. The Mirror Cell lowered next to the 8.4m Primary Mirror in its box.
 
 
 
 