March 2005

March 31     March 30     March 23     March 21     March 17     March 16     March 9     March 8     March 3     March 2     March 1


March 31

Photos by Jim Slagle

Cleaning the Primary Mirror in preparation for aluminizing bell jar tests. The guard railing on the Primary Mirror Cell.

The Telescope from below. The Aluminizing Bell Jar lifted up the hatch for testing on the first Primary Mirror.

Cleaning the Primary Mirror. Overpressure diaphragm that mounts in the hole in the mirror to control the differential vacuum between the front and back side of the mirror during aluminizing.

March 30

Photos by John Hill

Preparing to seal the Belljar onto the Primary Mirror Cell.
More from March 30
Top

March 23

Photos by John Little

Cleaning the Mirror.

March 29

Photos by John Hill

Lifting the Aluminizing Belljar and mounting on the Telescope.

March 21

Photos by John Hill

Overpressure diaphragm that mounts in the hole in the mirror to control the differential vacuum between the front and back side of the mirror during aluminizing.

March 17

Photos by John Hill


March 16

Photos by John Hill


March 9

Photos by John Hill

Ice on the LBT enclosure and Emerald Peak.

March 8

Photos by John Hill

Gluing the sfigotto seal in the Mirror Lab.

March 3

Photos by John Hill


Top

March 2

Photos by John Hill

  Installing the sfigotto seal around the edge of the primary mirror. The primary mirror with sfigotto seal.

March 1

Photos by John Hill

  CO2 snow cleaning of the mirror.
 
 
 
 