|
|

May 2002
May 29
May 28
May 24
May 20-21
May
16-17 May 13-14
May 8-10
|
May 29 |
Photos by John Hill |
 |
 |
|
Two trucks carrying the last 4 Azimuth Ring
sectors come up the LBT access road. Both the road and the forest are very
dry and dusty. |
The trucks are unloaded with the overhead
bridge crane. Each box is lifted with a pair of wire rope slings, and
placed on the floor. |
|
May 24 |
Photos by John Hill |
 |
 |
|
View of Firenze from the roof of Arcetri
Observatory. |
Simone Esposito pointing out the Pyramid
sensor on the AO test bench. |
|
May 16-17 |
Photos by John Hill |
 |
 |
|
LBT AGW (Acquisition, Guiding and
Wavefront) review meeting in Potsdam. |
Dome of the new library at
AIP. |
|
|