|
|

May 2004
May
31 May
27 May 26 May
22 May
21 May
19 May 15-17 May
14 May 13
May
11 May
5 May
3
|
May 27 |
Photos by John
Waack |
 |
|
The MCS (Mount Control System) Team, after successfully
moving the telescope under MCS control, a day ahead of schedule. |
Top
|
May 22 |
Photos by Jacopo
Farinato |
 |
 |
|
LBC lens assembly on the alignment fixture in the
semi-clean room at the telescope. |
- More from May 22
-
Top
|
May 21 |
Photos by Jacopo
Farinato |
 |
 |
|
John Hill working on the laser alignment of the
Gregorian bearing. |
Jacopo Farinato and John Hill admiring the large lens of
LBC. They are very happy that it has arrived on Mount Graham intact. |
- More from May 21
-
Top
|
May 19 |
Photos by Ray
Bertram |
 |
 |
|
The black cylinder with blue stripes is the
blue-optimized lens assembly for the Large Binocular Camera (LBC) prime
focus camera. |
- More from May 19
-
Top
- More from May 15-17
-
Top
Top
|
May 13 |
Photos by John
Hill |
 |
 |
|
|
J. Kraus installing network cables in the control room. |
Top
- More from May 11
-
Top
- More from May 5
-
Top
|
May 3 |
Photos by ADS
International |
 |
 |
|
LBT672 Adaptive Secondary electronics crates |
Top
|
|