ADS/EIE Pier Construction Procedures from the Foundations to the Setting
of the Azimuth Ring
Rigato and Zanon (1/95)
-
ADS/EIE Optimization of the Pier
Rigato (2/95)
-
ADS/EIE Static Verifications on Pier Structure
Preliminary Rigato (2/95)
-
ADS/EIE New LBT FEA Model Pier:
Upper Slab Optimization
Conte and Rigato (2/95)
-
ADS/EIE Final Configuration of the M2-F15
Spider Pozzi (3/95)
-
ADS/EIE Technical Specifications of Driving Systems
Tomelleri (3/95)
-
ADS/EIE Technical Report of Supporting, Driving, and Measuring Systems
Tomelleri (3/95)
-
ADS/EIE Telescope Drawings (3/95)
-
ADS/EIE Technical Specifications of Rim Gear Wheels
Tomelleri (4/95)
-
ADS/EIE Technical Specifications of Support Systems
Tomelleri (4/95)
-
ADS/EIE Technical Specifications of Support Systems
Tomelleri (5/95)
-
ADS/EIE Description and Comments of Pier Drawings
Rigato (5/95)
-
ADS/EIE Technical Specification of the Measuring Heads, Manual Drive,
Stow Pins, Limit Switches, Dampers and Rollshields
Tomelleri (5/95)
-
ADS/EIE Technical Specification of Driving Systems
Tomelleri (6/95)
-
ADS/EIE Technical Specification of Secondary and Tertiary Spiders with
Rotation Mechanisms
Pozzi (6/95)
-
ADS/EIE C-Ring Track Optimization
(6/95)
-
ADS/EIE Azimuth Track Optimization
(6/95)
-
ADS/EIE M2/F4 Secondary Spider Rotation Mechanisms
(7/95)
-
ADS/EIE Static Verification on Pier Structure
Rigato (7/95)
-
ADS/EIE New LBT FEA Model
Pier: Upper Slab Optimization
Rigato (7/95)
-
ADS/EIE Technical Specification Pier/Upper Ring Steel Structure
Marchiori (10/95)
-
ADS/EIE Technical Specification Azimuth Track
Marchiori (10/95)
-
ADS/EIE First Complete FEA Model
Rigato (10/95)
-
ADS/EIE C-Ring Track Optimization
Rigato (10/95)
-
ADS/EIE Azimuth Track Optimization
Rigato (10/95)
-
ADS/EIE LBT Machining and Assembly Procedure
Rigato (10/95)
-
ADS/EIE LBT Windscreen System Preliminary Calculations
Merlo (10/95)
-
ADS Working Drawings for last revision of LBT Structure
Gallieni (4/94)
-
ADS/EIE Preliminary Study of the LBT Foundation and Pier Structure
Rigato (5/94)
-
ADS Feasibility Study Completion
Buildings in the Final Site (Contract TE004 - 4 April 1994)
(7/94)
-
ADS/EIE Report on Optimization of the Pier Wind Deflections
Rigato (7/7/94)
-
ADS/EIE Report on Tracks, Fissaggi e Relativa Struttura di Supporto
e Centraggio del Telescopio LBT
Conte (7/8/94)
-
ADS Feasibility Study Completion
Buildings in the Final Site (Contract TE004)
Rev.1 (8/94)
-
ADS/EIE All Preliminary Drawings
(8/12/94)
-
ADS Feasibility Study Completion
Telescope (Contract E004)
(10/25/94) (Issue 2)
-
ADS/EIE Report on New LBT FEA Model Azimuth Frame Optimization
Conte (11/13/94)
-
ADS/EIE Report on New LBT FEA Model Pier: Upper Slab Optimization
Conte (11/13/94)
-
ADS/EIE Report on Telescope Design
(12/94)
-
ADS/EIE Report on M3 Spider
Gallieni (12/94)
-
ADS/EIE Report on M2-F15 Spider
Gallieni (12/94)
-
ADS/EIE Report on M2-F4 Spider
Gallieni (12/94)
-
ADS/EIE Presentation of Steel Structure Meeting in Arcetri (Florence)
(12/94)
-
Preliminary Study of the Support, Drive, Measuring Systems
Gallieni, Villa (4/87)
Feasibility Study of the Support, Drive, Measuring Systems
(4/87)
-
Static and Dynamic Analyses of the Elevation Structure of a
2 x 8M Optical Telescope (Volumes I & II)
Majorana, Schrefler, Zavarise (4/13-15/87) (7-8-87)
(Istituto di Scienza e Tecnica delle Costruzioni - University of Padova)
-
Static and Dynamic Analyses of the Elevation Structure of a
2x8 m Optical Telescope (Second Upgrade Model)
Zavarise, Majorana, Schrefler (10/87)
-
Construction and Machining Problems and Costs Evaluation
(4/87)
-
Preliminary Considerations on the Influence in Telescope and
Building Design of Various Handling and Storage Systems of
Optics and Instruments
Gallieni (4/87)
-
Investigations on Alternative Structures for the Double Shooter Telescope
Angel (5-23-87)