September 23

Photos by John Hill and Jim Slagle

Ready to turn off of Highway 366. Lifting the C-Ring box off of the truck.
   
The truck pulls out from under the box. Setting the box on the ground.
   
Lifting the C-Ring out of the box.

September 12

Photos by Ray Bertram and John Hill

The mirror cell convoy arrives at the Mirror Lab VERY early in the morning. The parking lot has been reserved so the truck has space to maneuver.
   
The Precision Heavy Haul truck backs under the Mirror Lab crane. The crane is attached to the cell.
   
View from above. The cranes lifts the 55-ton load.
   
The cell and its box are carefully lifted off the truck. Glen Weir prepares to open the package.
   
A few hours later, the wooden box has been reduced to rubble. The top cover is carefully removed.
   
Now, that is a mirror cell! The cell is moved into the Mirror Lab with the crane.

September 11

Photos by John Hill

The Primary 8.4m mirror being lowered in the Steward Observatory Mirror Lab.

September 7-10

Photos by John Hill and Jim Slagle

Mirror Cell box parked along I-10.

September 2-6

Photos by Luciano Miglietta and Ned Franz

First spaghetti al pesto at LBT.
Azimuth Ring Installation.
 
 
 
 