General

About the Project

Why Build LBT?

Mt. Graham Tours

LBT Apparel

 

 News and Updates

News and Status

Telescope Construction

Enclosure Construction

Publications

 

 The Telescope

Telescope

Instruments

Optics

First Light

Dedication

 

 People

Project Partners

Phone/Email Directory

Jobs

 

 Other Versions

Dedication (In Italian)

          Home

 

 

 

Photographs of telescope construction progress by month.

Movies    Live View (right front)    Live View (rear)    Live View (front)

2006     2005     2004    2003    2002     2001     2000     1999     1998     1997     1996

 

2006

New Pictures!

 

 

Top

 
 
 

2005

New Pictures!

 

 

Top

The first Primary Mirror installed on Mt. Graham, March 2005.
(Photo by John Hill)

2004

 

Top

The First Mirror Cell with Dummy Mirror (left) installed on the telescope on 14 January 2004
(Photo by Jeff Urban)

2003

 

 Top

Installing the C-Rings at Mt. Graham on 11 March 2003.
 (Photo by John Hill)

2002

 

 

Top

The assembled crowd and the assembled Large Binocular Telescope on the occasion of its presentation at the factory of Ansaldo-Camozzi Energy Special Components in Milan, Italy on 15 November 2001.
(Photo by Carlucci)

2001

Top

The Elevation Structure of the telescope is being pre-erected at the factory of Ansaldo Energia in Milan, Italy.
(Photo by Luciano Miglietta)

2000

 

Top

The Azimuth Frame and Azimuth Ring of the telescope have been pre-erected at the factory of Ansaldo Energia in Milan, Italy.
(Photo by Luciano Miglietta)

1999

 

Top

The Azimuth Ring of the telescope has been pre-erected at the factory of Ansaldo Energia in Milan, Italy.
(Photo by John Hill)

1998

 

 

 

 

 

Top

Rendered image of the LBT in the actual colors (RAL 3020 red and shiny aluminum) by European Industrial Engineering (EIE).


1997

 

 

Top


1996

 

Top

 

 

 
 
© 2006 Large Binocular Telescope Corporation